India's First Greenfield Smart Industrial City

Dholera SIR

Premium industrial & residential plots on the Delhi-Mumbai Industrial Corridor

920 Sq. Km Development
International Airport 2026
DMIC Strategic Location
₹1 Lakh Cr Investment
Get Instant Info on WhatsApp

India's First Greenfield Smart Industrial City

Dholera SIR

Premium industrial & residential plots on the Delhi-Mumbai Industrial Corridor

920 Sq. Km Development
Airport 2026
DMIC Location
₹1 Lakh Cr Investment
Get Instant Info on WhatsApp
The opportunity

A strategic address where industry meets opportunity

Dholera Special Investment Region is a flagship Delhi-Mumbai Industrial Corridor (DMIC) project offering world-class infrastructure, strategic location, and unmatched growth potential. It's India's largest planned smart city, with ₹1 lakh crore in committed investment, international connectivity, and government-backed infrastructure ready for immediate development.

920 km² Total planned development
95% Activation Area infrastructure ready
₹1L Cr Committed investment
Dec 2026 International airport operations
Why Dholera

Eight reasons investors are moving early

What makes Dholera India's most closely watched industrial city investment.

🏗️

India's first greenfield smart city

A completely new, planned industrial city built from scratch with modern infrastructure and sustainable design principles.

📍

Strategic DMIC location

Positioned on the Delhi-Mumbai Industrial Corridor, India's premier industrial development project connecting two major economic hubs.

🌍

920 sq. km development

Massive planned development across 22 villages, making it India's largest smart city project with comprehensive zoning.

✈️

International airport in 2026

Dholera International Airport runway complete, with commercial operations starting December 2026, providing global connectivity.

🛣️

Expressway operational

The Ahmedabad-Dholera Expressway opened in March 2026, reducing travel time and connecting to major industrial centers.

🏭

₹1 lakh Cr investment

Major anchor industries including Tata's ₹91,000 Cr semiconductor fab and Micron's $825M plant, currently under construction.

✅

95% infrastructure complete

The Activation Area (22.54 sq. km) has 95% trunk infrastructure ready, including roads, water, power, and utilities.

🏛️

Government backed

Overseen by the Gujarat Infrastructure Development Board (GIDB), headed by the Hon'ble Chief Minister of Gujarat.

Infrastructure

World-class amenities, already in the ground

State-of-the-art facilities designed for modern industrial and residential needs.

🛣️
72 km internal road network (12m–70m wide)
💧
50 MLD water treatment plant (operational)
🔌
Underground utility network (135 km pipelines)
⚡
220/33kV power substation by Torrent Power
🚰
10 MLD sewage treatment plant (operational)
🔋
Underground power cabling (200+ km)
📡
Smart city digital monitoring systems
🛡️
24×7 gated security & safety systems
🌳
80-ft wide internal roads in premium zones
🏢
Industrial SEZ (66.166 hectares)
☀️
Renewable energy zones (solar park)
🚂
250m expressway corridor connectivity
Connectivity

Location advantages that compound over time

Unbeatable connectivity and strategic positioning for maximum growth potential.

DMIC Corridor

100 km south of Ahmedabad on the Delhi-Mumbai Industrial Corridor.

Expressway

Ahmedabad-Dholera Expressway operational since March 2026.

International Airport

Dholera International Airport — runway complete, operations from Dec 2026.

Freight Corridor

Western Dedicated Freight Corridor completed March 2026.

High-Speed Rail

Proposed ₹18,901 Cr semi-high-speed rail (Sarkhej–Dholera).

Port Access

40 minutes from Bhavnagar Port for international trade.

Masterplan

A thoughtfully planned township

The masterplan features the Activation Area (22.54 sq. km), an Industrial SEZ (66.166 hectares for semiconductor & electronics), residential zones, commercial high streets, logistics parks, renewable energy zones (solar park), and a 250m expressway corridor with multi-modal connectivity.

Investment

Your Plot. Your Location. Your Price.

Premium plotted opportunities in Dholera. Multiple configurations • Limited inventory • Site visit available.

💬

Want the Price? Ask Us on WhatsApp.

Receive available plot sizes, location options and current pricing directly on WhatsApp.

Get Current Price →

Why this is a smart investment

Government-backed project

GIDB apex authority with Chief Minister oversight and central government partnership.

₹610 Cr budget, 2026–27

Government allocation for Phase-1 logistics and trunk infrastructure, ensuring continued development momentum.

High-growth DMIC corridor

India's premier industrial corridor connecting Delhi and Mumbai with massive economic potential and government support.

First-mover advantage

Early investment in India's largest smart city (920 sq. km) with significant appreciation potential as development progresses.

Anchor industries

Tata Semiconductor (₹91,000 Cr), Micron ($825M), and 28+ upcoming projects driving employment and infrastructure.

Infrastructure ready

95% trunk infrastructure complete in the Activation Area — roads, water, power and utilities ready for immediate development.

Long-term appreciation

Strategic location with airport, expressway, freight corridor, and rail connectivity ensuring sustained value growth.

Questions

Frequently asked questions

Get answers to common questions about Dholera investment.

Is Dholera government-approved?

Yes. Dholera is a Delhi-Mumbai Industrial Corridor (DMIC) project overseen by the Gujarat Infrastructure Development Board (GIDB), headed by the Hon'ble Chief Minister of Gujarat. DICDL (Dholera Industrial City Development Ltd.) is the implementation agency, with 51% equity from the Government of Gujarat and 49% from the Central Government (NICDIT).

What infrastructure is already complete?

The 22.54 sq. km Activation Area has 95% trunk infrastructure complete, including 72 km of internal roads, a 50 MLD water treatment plant, a 10 MLD sewage treatment plant, a 220/33kV power substation, 135 km of underground utility pipelines, and 200+ km of underground power cabling.

Is this good for investment?

Yes. Dholera offers strong long-term appreciation potential due to its strategic DMIC location, ₹1 lakh crore committed investment, operational expressway (March 2026), upcoming international airport (Dec 2026), anchor industries like Tata Semiconductor, and government-backed infrastructure development.

Can I book a private site visit?

Yes. Call or WhatsApp +91 7903768481 to schedule your guided tour of the Activation Area and available plot inventory. We offer personalized site visits with expert guidance on plot selection and investment strategy.

What are the plot price ranges?

Plot prices vary by zone: Activation Area (Zone A) ₹18,000–₹28,000/sq. yd., Zone B (near airport) ₹12,000–₹18,000/sq. yd., outer zones ₹8,000–₹12,000/sq. yd. Entry-level plots start from ₹6 lakh for 97 sq. yd. configurations.

Limited premium plots available Close to SIR

Reserve early. Choose the finest inventory. Secure your future.

Get Instant Info on WhatsApp
Get in touch

Book your free site visit

Fill out the form below and our team will contact you within 24 hours.

Get Instant Info on WhatsApp
💬